Obtained a favorable settlement for a Surety whose principal (tunneling contractor) had been terminated, in a dispute regarding claims of defective specifications and differing site conditions encountered during the construction of a sewer pipeline for King County.
Obtained a favorable settlement for a Design-Build Contractor in a dispute regarding delays and acceleration costs incurred constructing Allegiant Stadium in Las Vegas.
Obtained a favorable settlement for a Design-Build Contractor in a dispute with the Engineer of Record regarding delays on the construction of a light rail station for Sound Transit.
Obtained a $45,000,000 jury award for a Power Plant EPC contractor who accelerated construction to overcome delays caused by the Owner, a Municipal Corporation. Kiewit Power Constructors Co. v. City of Los Angeles, No. 2:16-cv-02590 (C.D. Cal. 2016).
Represented the EPC contractor on construction of Vogtle Nuclear Power Plants 3 and 4 in Waynesboro Georgia in litigation regarding regulatory and design changes exceeding $1.5 Billion, Georgia Power Co. v. Westinghouse Electric Company LLC et al. No. 12-167 (S.D. Georgia 2015).
Favorable settlement of all claims in concurrent actions in the DC Superior Court and before the Civilian Board of Contract Appeals regarding renovation of fire damage at the Ronald Reagan Building and International Trade Center.
Successful bid protest at US Court of Federal Claims, where the Court issued a permanent injunction preventing the Defense Information Systems Agency from issuing an award under an improper reprocurement. Level 3 Communications, LLC v. United States, 129 Fed. Cl. 487 (2016).
Successfully represented intervener in a bid protest at the Maryland State Board of Contract Appeals and in the subsequent Petition for Judicial Review in the Circuit Court for Baltimore City regarding a MDTA procurement to clean and paint the William Preston Lane, Jr. Memorial Bridge. (Docket Nos. MSBCA 2963 and 2968).